Champion Lakes Stormwater
Champion Lakes, Western Australia
The project involved stormwater installation in Champion Lakes, addressing clay soil conditions and fluctuating water tables to ensure effective drainage solutions.
Contract Type: Sub ContractorYear completed: 2024
Project Details
Drainage Design
Development of an effective stormwater management plan tailored for the site.
Excavation Works
Excavating trenches and pits to install drainage systems.
Install Systems
Laying down pipes, inlets, and outlets for efficient water flow.
Project Documentation
Maintaining records of progress, materials used, and compliance with regulations.
Project Challenges
Clay Soil Compaction
Difficulty in achieving proper compaction due to saturated clay conditions.
Weather Impacts
Rainfall causing delays and requiring adaptive scheduling for wet conditions.

