[email protected]

08 9250 8854

USCM Logo

Yanchep Subdivision

Yanchep, Western Australia

Engaged by RJV to construct project roads for the Yanchep stage 1/2 subdivision on Romeo road, enhancing infrastructure and accessibility while ensuring compliance with safety and environmental standards throughout the development process.

Contract Type: Sub ContractorYear completed: 2023
Yanchep Subdivision

Project Details

Project planning
Utilized graders to perform precise grading for road surfaces, ensuring proper alignment and elevation.
Cross slope maintenance
Maintained appropriate cross-slopes for effective drainage and surface water management during grading.
Site preparation
Collaborated with the road crew to clear vegetation and debris from the roadbed before grading.
Compaction
Ensured adequate soil compaction using heavy machinery to create a stable base for road construction.

Project Challenges

Variable soil conditions
Encountered different soil types that affected grading and required adjustments in techniques.
Utility conflicts
Identified underground utilities that complicated grading operations and required careful navigation.
Dust control
Managing dust generation from grading activities to comply with environmental regulations and minimise impact on nearby areas.
Limited access
Restricted site access for heavy machinery due to surrounding terrain or existing infrastructure.
Yanchep Subdivision view 1
Yanchep Subdivision view 2
Yanchep Subdivision view 3