HV / LV Installation
Henley Brook, Western Australia
We were engaged by Tracc Civil to assist with the installation of high voltage and low voltage cables. The scope involved careful trenching, cable laying, and coordination around existing underground services to ensure safety and compliance with electrical standards.
Contract Type: Sub ContractorYear completed: 2025
Project Details
Project planning
Focused on detailed site assessment, sequencing of HV and LV cable installations and ensuring all works adhered to safety regulations and service authority requirements.
Problem solving
Adapting installation methods to navigate existing services, addressing access constraints and ensuring compliance with electrical safety standards throughout the project.
Safety measures
With strict safety measures including exclusion zones, PPE and live service identification protocols in place.
Inspection & testing
Inspection and testing were carried out throughout the project to verify correct cable placement, ensure compliance with electrical standards and confirm system integrity before commissioning.
Project Challenges
Plant Interaction
Causing site congestion and safety risks. Conflicting schedules leading to delays.
Materials Delay
We implemented proactive procurement planning, maintained regular communication with suppliers and kept a buffer stock of critical items on site to avoid work stoppages.
Underground Services
Using vacuum excavation and trained personnel to safely expose and handle existing cables.
Inclement Weather
To manage inclement weather, we implemented flexible scheduling, used protective coverings and drainage systems onsite and monitored forecasts closely to adjust work plans and ensuresafety.