Autonomous Towers
Wheatbelt, Western Australia
Our company was engaged by Pilbara Networks to complete detailed earthworks for autonomous towers at Mesa A,J,and H near Pannawonika, ensuring optimal site preparation.
Contract Type: Sub ContractorYear completed: 2021
Project Details
Remote mobilisation
Transporting tipper trucks and skid steers to the site for efficient earthmoving operations.
Site preparation
Utilising skid steers for grading and leveling the terrain needed for autonomous tower installations.
Material transport
Employing tipper trucks to transport soil and other materials to and from the site for earthworks.
Operational oversight
Ensuring all equipment is operated safely and efficiently, adhering to project timelines and safety regulations.
Project Challenges
Access limitations
Difficult terrain and narrow access routes restricted the movement of heavy machinery and equipment.
Environmental considerations
Compliance with environmental regulations added complexity to site operations and necessitated additional monitoring.
Exisiting infrastructure
Proximity to existing infrastructure required careful planning and coordination.
Safety hazards
Identifying and mitigating potential safety hazards on-site was a continuous priority to protect workers and equipment.