Andrea Drive - Sewer

Henley Brook, Western Australia

Tracc Civil engaged us to carry out the complete sewer installation on Andrea Drive, encompassing trench excavation, precise pipe laying, comprehensive testing. The project was executed efficiently, meeting all quality standards and delivered on schedule.

Contract Type: Sub ContractorYear completed: 2025
Andrea Drive - Sewer

Project Details

Project planning
Detailed site surveys, phased trenching and pipe laying, coordinated testing and efficient site restoration to ensure on-time, safe and compliant completion.
Planning
Securing permits, mobilizing equipment and materials, setting up traffic and safety controls and conducting site inductions to ensure a smooth start to the works.
De-watering
Was strategically executed through the installation of well points and sump pumps, effectively controlling groundwater infiltration to ensure safe, dry, and stable trench conditions throughout construction.
Problem solving
Involved quickly adapting to unexpected groundwater inflows and site conditions by modifying de-watering methods and adjusting excavation sequences to maintain progress and safety.

Project Challenges

Stay Wires
Planned work sequencing and downsized in equipment to safely navigate around stay wires
Communication Cables
Locating and marking all services, using vacuum excavation and coordinating with providers to prevent damage.
Over Head Power Lines
Conduct thorough site assessments and use clear communication protocols to ensure safe operations around power infrastructure.
Open Excavations
Implementing trench support systems, safe access points and clear exclusion zones around the open excavation.
Andrea Drive - Sewer view 1
Andrea Drive - Sewer view 2
Andrea Drive - Sewer view 3